Running of the Red Bulls Build Totals
84 Lumber Shit Load of wood  $          378.75
Home Depot Nuts/Bolts/Nails/Joist Hanger, PVC tubing,  PVC fittings, brackets,   $          371.15
Lowes Chicken wire, bolts, rope, tie downs, staples, and bolts  $          133.68
OSH Metal Mesh & Steel Rods  $            89.29
Dom's Outdoor White Duct Tape & 30' Bungee Cord  $            30.27
Discount Fabric Red Furry Fabric, Red farbic for sashes  $          393.89
Togos Lunch  $            15.92
Chevy's Gift Certificate  $          100.00
MISC Drink & Video Tape Pier 23  $            30.00
WalMart Plastic Cover  $              8.57
Jo-Ann Fabric Black Vinyl  $              7.57
AcroSports Website Acrosport's website redesigned inexchange for teeter board training (shannon cost of ownership is reduce to 10% because of his work for the website)  40 - 50 hours 
 TOTAL:   $    1,559.09
Team Member Desc Contributions/member to date Ownership % Cost Per Member
Cervenka Everything else  $                1,015.36 30%  $          467.73
Brian Nut and bolts at Lowes & Fabric  $                   296.81 30%  $          467.73
Schaeffer Fabric, Drinks, & Video Tape  $                   112.76 30%  $          467.73
Shannon Beer, Food, & OSH  $                   134.16 10%  $          155.91